Overpass Artiža vas 1 & 2
The overpasses over the railway and motorway enable access to Artiža vas village. A local road spans the railway with an integral RC frame structure of the overpass which has three spans. A bit further on, the local road crosses the MW with a semi-integral structure of overpass, which has four spans of prestressed RC superstructure.
TECHNICAL DATA
- MW Section: Višnja gora - Bič
- Build: 2004
- Design: Main & Executive
- Designer: PROMICO Ltd.
- Contractor: SCT Plc
- Investor: R. Slovenia, DARS Plc
- Structure: Overpass Artiža vas 1
- Total length: 100m
- Span length: 27m
- Width: 8.7m
- Total area: 1100m²
- Structure: Overpass Artiža vas 2
- Total length: 41m
- Span length: 17m
- Width: 8.7m
- Total area: 1100m²