Overpass Pluska


The specific integral structure of the overpass is build as a sickle-shaped arch with a span of 50 m over a deep stone cut. Both ends of the superstructure are rigidly connected to arch foundations with inclined walls.

Good quality of bearing ground and height availability in deep cut of the motorway allowed the use of the arch structure of the overpass.

TECHNICAL DATA

  • MW Section: Korenitka-Pluska
  • Structure: Overpass Pluska

  • Total length: 72m
  • Span length: 50m
  • Width: 9m
  • Total area: 630m²

  • Build: 2005
  • Design: Main & Executive
  • Designer: PROMICO Ltd.
  • Contractor: SCT Plc
  • Investor: R. Slovenia, DARS Plc