Pile Walls on Eastern Bypass MW in Maribor

A number of geotechnical structures were used when executed the eastern bypass MW in Maribor with two anchored pile walls OZ-3 and OZ-4 among them.

TECHNICAL DATA

  • MW Section: Zrkovska c.-Pesnica

  • Structure: Pile walls OZ-3, OZ-4
  • Total Length: 105m (OZ-3), 200m (OZ-4)

  • Build: 2009
  • Design: Main & Executive
  • Designer: PROMICO Ltd.
  • Contractor: SCT Plc
  • Investor: R. Slovenia, DARS Plc