Pile Walls on Eastern Bypass MW in Maribor
A number of geotechnical structures were used when executed the eastern bypass MW in Maribor with two anchored pile walls OZ-3 and OZ-4 among them.
TECHNICAL DATA
- MW Section: Zrkovska c.-Pesnica
- Structure: Pile walls OZ-3, OZ-4
- Total Length: 105m (OZ-3), 200m (OZ-4)
- Build: 2009
- Design: Main & Executive
- Designer: PROMICO Ltd.
- Contractor: SCT Plc
- Investor: R. Slovenia, DARS Plc